Notting Hill Gate

This complex, long-term project began in 2017 but experienced delays due to contractual issues. The scaffolding encompassed all elevations, fully boarded, and included a pedestrian splash fan and full temporary roof covering.

As the site progressed into the demolition phase, the scaffold was adapted accordingly and included:

  • Four crash-deck scaffolds built to design for each floor
  • Internal hoist tower for debris removal
  • Traditional rear staircase and Haki staircases to all floors
  • Handrails at each level for added safety

The next phase involves new-build construction at full height, along with a new temporary roof and a front-facing loading gantry. This project is expected to continue for the next two years.